Azerbaijani state agency about roads under construction in Karabakh, East Zangezur
2 Sentyabr 2021 12:54 EnIn parallel with the construction of the chr("39")Victory Roadchr("39") with a length of 101 km, the roads of Ahmedbeyli-Fuzuli-Shusha with a length of 81.6 km, Toganaly-Kalbajar-Istisu (80.7 km), Kalbajar-Lachin (72.3 km), Ahmadbayli, Horadiz, Minjivan-Aghband (123.8 km), Olaylar reports via the State Agency of Azerbaijan Automobile Roads.
According to the information, the construction of the Talish-Tapgaragoyunlu-Gashalty (22 km), Khudafarin-Gubadly-Lachin (83 km), Shukurbayli-Jabrayil-Hadrut (43 km), Fuzuli-Hadrut (13 km) and Barda-Aghdam (45 km).
Təklifinizi, şikayətinizi bizə yazın. Sizi dinlərik. 055 634 88 31